[{"data":1,"prerenderedAt":61},["ShallowReactive",2],{"q-105170-arch_construction-71":3},{"question":4,"neighbors":26,"sameNumber":45,"prev":34,"next":37},{"id":5,"classKey":6,"session":7,"year":8,"subject":9,"number":10,"groupStem":11,"ownStem":12,"stem":12,"options":13,"answer":18,"answerKind":20,"answerS":11,"answerNote":11,"images":21,"explanation":22,"withheld":11,"deepChars":23,"freq":24,"indexable":25},"arch-105170-801-0103-071","architect","105170",105,"建築構造與施工",71,null,"公共工程之工程結案程序，下列何者正確？①驗收 ②結算 ③申報竣工 ④監造查驗",{"A":14,"B":15,"C":16,"D":17},"③④①②","④①②③","③④②①","①②③④",[19],"A","single",[],"本題考點：公共工程完工後的結案流程——由廠商申報竣工啟動，經監造單位查驗確認竣工、機關辦理驗收，最後在驗收完畢後辦理結算，四個步驟的先後順序。\n【正解理由】結案程序有一條「觸發 → 確認 → 驗收 → 結算」的邏輯鏈。第一步是③申報竣工：政府採購法施行細則關於竣工確認的規定，要求廠商於工程預定竣工日前或竣工當日，以書面將竣工日期通知監造單位及機關，整個結案流程由這個通知啟動。第二步是④監造查驗：機關會同監造單位及廠商，依據契約、圖說核對竣工之項目及數量，確定是否竣工；竣工後監造單位還要整理竣工圖表與結算明細等資料送機關審核，竣工圖則由承包商提經監造者核可（《結構混凝土施工規範》第 1.1.6 節）。第三步是①驗收：機關收齊資料後，有初驗程序者先辦初驗，再辦正式驗收，確認工程符合契約。第四步是②結算：依《政府採購法》第 73 條第 1 項，工程採購「經驗收完畢後」，才由驗收及監驗人員於結算驗收證明書上分別簽認——結算以驗收完畢為前提，一定排在驗收之後。四步依序為③④①②，故選 A。\n【逐項排除】\n(A) ③④①②：正確。申報竣工、監造查驗、驗收、結算，與竣工通知、竣工確認、驗收、驗收完畢後簽認結算驗收證明書（《政府採購法》第 73 條第 1 項）的順序完全相符。\n(B) ④①②③：錯在把③申報竣工放到最後。監造查驗核對的是「已申報竣工」的工程項目與數量，沒有竣工通知，監造單位與機關無從確認是否竣工；驗收與結算更不可能在竣工之前完成。申報竣工應移到最前面，改為③④①②才對。\n(C) ③④②①：前兩步正確，錯在②結算排在①驗收之前。《政府採購法》第 73 條第 1 項明定結算驗收證明書是在「驗收完畢後」才簽認；未經驗收就結算，等於在尚未確認工程是否合格、是否須減價收受或扣款時就結清價款。①與②必須對調。\n(D) ①②③④：順序整個顛倒，有兩處錯誤。其一，驗收以竣工為前提，申報竣工是整個流程的起點，不能排在驗收與結算之後；其二，監造查驗是驗收前的竣工確認，也不能排在最後。正確順序為③④①②。\n【記憶點】公共工程結案四步：「報竣工、監造查、機關驗、最後算」——先有竣工才有驗收，驗收完畢才有結算。",787,1,true,[27,30,33,36,39,42],{"number":28,"session":7,"stem":29},68,"給水管路全部或部分完成後，應加水壓試驗，其試驗壓力及時間，下列何者較正確？",{"number":31,"session":7,"stem":32},69,"工期計算常排除豪雨天候，所謂豪雨是指下列何者？",{"number":34,"session":7,"stem":35},70,"下列何者是合理的工作程序？①開挖 ②施打鋼板樁 ③裝設傾斜儀 ④抽排水",{"number":37,"session":7,"stem":38},72,"公共工程的營建發包合約包含下列那些內容？①工程項目詳細表 ②單價分析 ③包商利潤管理…",{"number":40,"session":7,"stem":41},73,"設計變更有新增項目以致總價有所變更時，應在何時辦理估驗計價？",{"number":43,"session":7,"stem":44},74,"有關工程進行中之變更設計，下列敘述何者正確？",[46,49,52,55,58],{"number":10,"session":47,"stem":48},"114180","依據建築技術規則檢討各個設置場所對應的防火門性能，下列敘述何者錯誤？",{"number":10,"session":50,"stem":51},"113190","依據我國建築技術規則建築設計施工編有關防火門構造之規定，下列敘述何者錯誤？",{"number":10,"session":53,"stem":54},"112190","因氣候變遷導致超過原有防洪設施保護標準之降雨事件頻傳，過往「完全由河川或排水承納洪水…",{"number":10,"session":56,"stem":57},"111180","室內裝修工程常見之分間牆資材，若依碳足跡標準由高至低排列，下列何者正確？①10 公分…",{"number":10,"session":59,"stem":60},"110180","下列那項構造不符合建築技術規則中二小時以上之防火時效要求？",1791863214876]