[{"data":1,"prerenderedAt":61},["ShallowReactive",2],{"q-106180-arch_construction-77":3},{"question":4,"neighbors":26,"sameNumber":45,"prev":34,"next":37},{"id":5,"classKey":6,"session":7,"year":8,"subject":9,"number":10,"groupStem":11,"ownStem":12,"stem":12,"options":13,"answer":18,"answerKind":20,"answerS":11,"answerNote":11,"images":21,"explanation":22,"withheld":11,"deepChars":23,"freq":24,"indexable":25},"arch-106180-801-0103-077","architect","106180",106,"建築構造與施工",77,null,"下列建築管理作業，何者需由設計人會同申請，或於申請書中簽章？①建造執照申請 ②申請開工備查 ③申報勘驗 ④申請使用執照",{"A":14,"B":15,"C":16,"D":17},"僅①","僅①②","僅①②③","①②③④",[19],"A","single",[],"本題考點：建造執照申請、開工備查、申報勘驗與申請使用執照四個建築管理程序，各由哪些人申請、會同或簽章，關鍵在分清「設計人」與「監造人」的角色。\n【正解理由】依《建築法》第 30 條，起造人申請建造執照應備具申請書、土地權利證明文件、工程圖樣及說明書；同法第 31 條規定申請書應載明設計人之姓名、住址、所領證書字號及簽章，所以建造執照申請必須有設計人簽章。其餘三個程序的法定參與者都沒有設計人：開工前由起造人會同承造人及監造人申請備查（《建築法》第 54 條第 1 項）；勘驗由承造人會同監造人按時申報（同法第 56 條第 1 項）；使用執照由起造人會同承造人及監造人申請（同法第 70 條第 1 項）。四項中只有①符合題目所問，故選 A。\n【逐項排除】\n① 建造執照申請：申請書法定應載事項包含設計人之姓名、住址、證書字號及簽章（《建築法》第 31 條），符合題目所問。\n② 申請開工備查：由起造人會同承造人及監造人，連同承造人施工計畫書申請備查（《建築法》第 54 條第 1 項），參與者是監造人而非設計人，不符合題目所問。\n③ 申報勘驗：由承造人會同監造人按時申報後方得繼續施工（《建築法》第 56 條第 1 項），不涉及設計人，不符合題目所問。\n④ 申請使用執照：由起造人會同承造人及監造人申請，申請時檢附原領建造執照與竣工圖（《建築法》第 70 條第 1 項、第 71 條第 1 項），仍不涉及設計人，不符合題目所問。\n(A) 僅①：只有建造執照申請書需設計人簽章，符合題意。\n(B) 僅①②：多列了②，開工備查會同的是承造人與監造人，不是設計人。\n(C) 僅①②③：多列了②③，開工備查與申報勘驗都由監造人參與，不是設計人。\n(D) ①②③④：多列了②③④，三個施工與竣工階段的程序都是監造人會同，此選項把監造人當成設計人。\n【記憶點】設計人只出現在「申請建照」的申請書；開工、勘驗、使照這些施工到竣工的程序，會同的是承造人與監造人。",729,1,true,[27,30,33,36,39,42],{"number":28,"session":7,"stem":29},74,"依公有建築物施工階段契約約定權責分工表之內容，工程竣工圖說作業下列何者錯誤？①工程竣…",{"number":31,"session":7,"stem":32},75,"大面積單元式帷幕牆之風雨試驗，其試體之寬度不得少於幾個標準單元（構件）？",{"number":34,"session":7,"stem":35},76,"含高碳之鋼筋較適合之續接方式為何？①搭接 ②瓦斯壓接 ③銲接 ④續接器",{"number":37,"session":7,"stem":38},78,"下列事項的辦理順序，何者正確？①申辦電信設計許可 ②申辦都市設計審議許可 ③申辦地目…",{"number":40,"session":7,"stem":41},79,"公共工程依規定登錄於行政院公共工程委員會資訊網路之監造人員何時可解除其登錄並轉任於其…",{"number":43,"session":7,"stem":44},80,"依據公共工程施工品質管理作業要點規定，監造人員需全程在場監造之時機為：",[46,49,52,55,58],{"number":10,"session":47,"stem":48},"114180","有關鋼結構製造之品質管制內容，不包括下列何者？",{"number":10,"session":50,"stem":51},"113190","關於要徑法（Critical Path Method, CPM）在工程進度排程中的應…",{"number":10,"session":53,"stem":54},"112190","下列關於總價承包契約（lump-sum contracts）之特性敘述，何者錯誤？",{"number":10,"session":56,"stem":57},"111180","有關建築施工估價與數量計算之敘述，下列何者錯誤？",{"number":10,"session":59,"stem":60},"110180","依我國現況，下列對於木質材料或構造的敘述，何者錯誤？",1791863212923]