[{"data":1,"prerenderedAt":63},["ShallowReactive",2],{"q-107180-arch_construction-75":3},{"question":4,"neighbors":28,"sameNumber":47,"prev":36,"next":39},{"id":5,"classKey":6,"session":7,"year":8,"subject":9,"number":10,"groupStem":11,"ownStem":12,"stem":12,"options":13,"answer":18,"answerKind":20,"answerS":11,"answerNote":11,"images":21,"explanation":23,"withheld":24,"deepChars":25,"freq":26,"indexable":27},"arch-107180-801-0103-075","architect","107180",107,"建築構造與施工",75,null,"下圖為某一工程作業之施工網圖，試判斷何者為要徑？",{"A":14,"B":15,"C":16,"D":17},"B→D→G","B→E→H","A→C→F","A→C→G",[19],"D","single",[22],"\u002Fimages\u002Farch-107180-801-0103-075.png","","figure-values",0,1,false,[29,32,35,38,41,44],{"number":30,"session":7,"stem":31},72,"有關新建建築物對土壤液化之對策，下列敘述何者錯誤？",{"number":33,"session":7,"stem":34},73,"有關建築施工管理之敘述，下列何者錯誤？",{"number":36,"session":7,"stem":37},74,"磨石子地磚工法比現場磨石子工法普及的原因，不包含下列何種特質？",{"number":39,"session":7,"stem":40},76,"有關工地控制進度常用之進度曲線（S 曲線），下列敘述何者錯誤？",{"number":42,"session":7,"stem":43},77,"有關地基調查事項，下列敘述何者錯誤？",{"number":45,"session":7,"stem":46},78,"有關避免施工鄰損爭議之敘述，下列何者錯誤？",[48,51,54,57,60],{"number":10,"session":49,"stem":50},"114180","分工結構圖係指依作業性質之不同，將工程細分至一易於掌握、管理的單位，以作為時程管理、…",{"number":10,"session":52,"stem":53},"113190","下列那一種圖可將工程細分至易於掌握與管理，以作為進度安排、成本會計管理？",{"number":10,"session":55,"stem":56},"112190","關於木構造估價要點，下列敘述何者錯誤？",{"number":10,"session":58,"stem":59},"111180","規模相同時，SRC、SS、RC 構造施工之特性比較，下列何者錯誤？",{"number":10,"session":61,"stem":62},"110180","有關地基調查報告，採地下探勘方法，下列敘述何者錯誤？",1791863210947]