[{"data":1,"prerenderedAt":60},["ShallowReactive",2],{"q-112190-arch_construction-44":3},{"question":4,"neighbors":26,"sameNumber":44,"prev":33,"next":36},{"id":5,"classKey":6,"session":7,"year":8,"subject":9,"number":10,"groupStem":11,"ownStem":12,"stem":12,"options":13,"answer":18,"answerKind":20,"answerS":11,"answerNote":11,"images":21,"explanation":22,"withheld":11,"deepChars":23,"freq":24,"indexable":25},"arch-112190-801-0103-044","architect","112190",112,"建築構造與施工",44,null,"有關預力混凝土構材之澆灌，下列敘述何者錯誤？",{"A":14,"B":15,"C":16,"D":17},"工作人員須戴上眼罩設備","灌漿前應檢查所有管線","為確保管線可以暢通無阻，可以壓縮空氣實施檢查","為了觀察水泥砂漿有無從管道末端湧出，必要時得直接以眼窺視管道內部狀況",[19],"D","single",[],"本題考點：後拉法預力混凝土構材在施預力、錨定之後，將漿體灌入套管（灌漿作業）時的事前檢查要點與作業人員的安全防護。\n【正解理由】後拉法的鋼腱施拉、錨定後，要從灌漿口以壓力把漿體灌入套管，直到另一端的出漿口或排氣口連續湧出漿體，才算確認管道已經灌滿。漿體在管內承受壓力，出漿口與排氣口隨時可能噴出漿體，原本堵塞的位置被壓力突然沖開時更會猛烈噴射；水泥漿呈強鹼性，濺入眼睛會造成嚴重傷害。所以觀察漿體是否湧出，應戴護目設備、站在管口側面、從管口外觀察出漿情形，不可把眼睛湊到管口往內看。(D) 說必要時得直接以眼窺視管道內部，違反灌漿作業最基本的人員防護原則，是錯誤敘述。故選 D。\n【逐項排除】\n(A) 正確。灌漿是壓力作業，漿體可能從灌漿口、接頭或排氣口噴濺，作業人員須戴上眼罩（護目鏡）保護眼睛。這與施預力作業的安全觀念一致：《結構混凝土施工規範》第 14.6.1 節指出高拉力狀態下的鋼腱蓄有很大能量，施預力作業中人員絕對禁止進入施拉裝置或固定裝置的後方。兩者都是「能量可能瞬間釋放時，人不站在噴射方向上」。\n(B) 正確。灌漿前要逐一檢查套管、灌漿口、排氣管與連接管是否暢通，接頭是否密合、不會漏漿，閥門是否在正確位置。若漏檢，漿體灌到一半遇到堵塞，管內就會留下空隙，該段鋼腱失去與漿體的握裹，也失去防蝕保護。同樣的檢查觀念從澆置混凝土前就開始：《結構混凝土施工規範》第 14.4.4 節要求澆置混凝土之前應檢修套管及灌漿配件之孔洞。\n(C) 正確。讓壓縮空氣通過套管、確認另一端有氣流排出，是檢查管線暢通、找出堵塞位置的常用方法，同時能把管內的積水與雜物吹出；《建築物混凝土結構設計規範》第 11.16.4 節也要求構材如曝露於冰凍氣候下，灌漿前套管內部應無積水。用壓縮空氣檢查時同樣不能把臉對著管口，因為氣流可能夾帶碎屑噴出。\n(D) 錯誤。錯在「直接以眼窺視管道內部」：管內有壓力漿體或壓縮空氣時，眼睛湊近管口有被噴射傷害的危險，這種觀察方式在任何情況下都不應採用。正確的敘述應為：「為觀察水泥砂漿有無從管道末端湧出，應戴護目設備，從管口側面觀察出漿口是否連續湧出與灌入時稠度相同的漿體。」\n【記憶點】灌漿前先查管、用氣吹通，作業全程戴眼罩；看出漿只能從側面看，不能對著管口看。",801,1,true,[27,30,32,35,38,41],{"number":28,"session":7,"stem":29},41,"有關室內裝修工程的敘述，下列何者錯誤？",{"number":31,"session":7,"stem":29},42,{"number":33,"session":7,"stem":34},43,"有關廠製金屬三明治板外牆，下列敘述何者錯誤？",{"number":36,"session":7,"stem":37},45,"有關人字臂起重桿之安全管理，下列敘述何者錯誤？",{"number":39,"session":7,"stem":40},46,"依營造安全衛生設施標準規定，對於施工構臺應辦理項目，下列敘述何者錯誤？",{"number":42,"session":7,"stem":43},47,"木構造框組壁式工法之設計原則，下列何種做法較不恰當？",[45,48,51,54,57],{"number":10,"session":46,"stem":47},"114180","有關清水混凝土（architecture exposed concrete）之敘述，…",{"number":10,"session":49,"stem":50},"113190","張貼石材若以水泥砂漿為黏著材料，日後經雨水浸淋易產生游離石灰水滲出施工勾縫，乾燥後形…",{"number":10,"session":52,"stem":53},"111180","清水砌磚工法中勾縫之目的為何？①黏著 ②防水 ③美觀 ④抑制白華",{"number":10,"session":55,"stem":56},"110180","鋁門窗的性能，以 CNS 11526 門窗抗風壓性試驗法進行試驗。其抗風壓性能，允許…",{"number":10,"session":58,"stem":59},"109180","下列擋土措施之敘述，何者錯誤？",1791863200570]