[{"data":1,"prerenderedAt":61},["ShallowReactive",2],{"q-113190-arch_construction-66":3},{"question":4,"neighbors":26,"sameNumber":45,"prev":34,"next":37},{"id":5,"classKey":6,"session":7,"year":8,"subject":9,"number":10,"groupStem":11,"ownStem":12,"stem":12,"options":13,"answer":18,"answerKind":20,"answerS":11,"answerNote":11,"images":21,"explanation":22,"withheld":11,"deepChars":23,"freq":24,"indexable":25},"arch-113190-801-0103-066","architect","113190",113,"建築構造與施工",66,null,"採用 4 mm 厚度以下薄石材版片作為室內裝修透光牆版面吊掛施作，那項前置作業錯誤？",{"A":14,"B":15,"C":16,"D":17},"背透照明採光設計施工","背板採蜂巢版或膠合玻璃張貼","背板採圬工性質之面接合張貼","一二次接合金屬件",[19],"C","single",[],"本題考點：超薄石材（題目設定 4 mm 厚度以下）作為室內透光牆的構成方式，重點在背板必須「透光、輕量、補強」，並以金屬件乾式吊掛，而不是傳統石材的濕式砂漿張貼。\n【正解理由】薄石材之所以能做成透光牆，是因為石片夠薄，光線可以從背面穿透，呈現石紋的透光效果；但石片同時也變得脆弱，無法自立，必須先黏貼在背板上形成複合板，再以金屬件吊掛到牆體骨架。因此前置作業有三個環節：先規劃背透照明（光從哪裡來）、再選擇透光且輕量的背板（蜂巢版或膠合玻璃）、最後設計一次與二次接合金屬件（怎麼掛上去）。選項（C）的「圬工性質之面接合張貼」，是指以水泥砂漿這類圬工材料整面墁貼；《結構混凝土施工規範》第 7.7 節說明磚石圬工用水泥砂漿是用於墁砌磚石的圬工作業，這種砂漿層不透光、自重大，會直接擋住背光，也增加薄石片的負擔，與透光吊掛牆的需求相反。故選 C。\n【逐項排除】\n(A) 正確。透光牆的效果來自背面光源，背透照明的燈具位置、間距與維修空間必須在石材安裝前就定案，否則板片封上後難以調整；因此背透照明的採光設計施工屬於前置作業。\n(B) 正確。蜂巢版重量輕、剛性高，可補強薄石片並減少吊掛載重；膠合玻璃透明，貼合後光線仍可穿透，且中間膜可在破損時保持板片不散落。兩者都是兼顧透光與補強的背板做法。\n(C) 錯誤，為本題答案。錯在兩處：一是材料性質，圬工砂漿不透光，貼上後背光無法穿過石片，透光牆的功能直接喪失；二是構法，濕式面貼是把石材當作貼附在實體牆上的飾面，不是可吊掛的複合板，自重增加且薄石片易受砂漿收縮影響而破裂。改成「背板採蜂巢版或膠合玻璃等透光、輕量背板，以接著劑貼合成複合板」才符合題目情境。\n(D) 正確。吊掛工法需先設定一次接合金屬件（固定於結構體或牆體骨架）與二次接合金屬件（連接石材複合板並可微調位置），兩段式接合讓板片可調整垂直度與縫寬，也讓背光空間得以保留。\n【記憶點】薄石透光牆三步驟：背光先規劃、背板要透光輕量、金屬件乾式吊掛；凡是「砂漿整面貼」都和透光吊掛相衝突。",596,1,true,[27,30,33,36,39,42],{"number":28,"session":7,"stem":29},63,"混凝土輸送時應保持品質均勻，避免不當之材料析離或坍度損失，下列何項敘述錯誤？",{"number":31,"session":7,"stem":32},64,"依據建築物無障礙設施設計規範，輪椅使用者正向接近時，雙手可及之最高高度應為多少公分？",{"number":34,"session":7,"stem":35},65,"鋼構造接合工法中，關於高拉力螺栓的敘述何者錯誤？",{"number":37,"session":7,"stem":38},67,"木構造建築之防蟻工法依白蟻種類、鄰接建築物蝕害程度、周圍環境及建地條件上有所不同，下…",{"number":40,"session":7,"stem":41},68,"在「不會對環境及人體健康造成負擔」的考量下，選擇室內裝修材料所需考量的事項，下列何者…",{"number":43,"session":7,"stem":44},69,"有關景觀工程中之透水鋪面的描述，下列何者錯誤？",[46,49,52,55,58],{"number":10,"session":47,"stem":48},"114180","屋頂綠化之施作包含下列六項重點：①阻根層 ②介質層 ③排水 ④過濾層 ⑤防水層 ⑥植…",{"number":10,"session":50,"stem":51},"112190","有關建築工程常用的各種填縫材，下列敘述何者正確？",{"number":10,"session":53,"stem":54},"111180","有關暗架天花板相關施工要求，下列何者不符合規範？",{"number":10,"session":56,"stem":57},"110180","依建築技術規則建築構造編，辦公室或類似應用之建築物，如採用活動隔牆，應按每平方公尺多…",{"number":10,"session":59,"stem":60},"109180","下列工作之先後程序何者正確？①申報竣工 ②消防安全檢查 ③拆鷹架 ④完成外牆磁磚",1791863198744]